
The Yard
ohhhhh the yard.
This place is a curse,I cannot count the hours i have spent in the bck yard with Samwise digging and shaping the place.
I have always been an obsessive person,Link that with the fact that i LOVE driving Diggers and building new stuff to ride and you start to get the amount of time that has been put into this project.When Me,Gee and Sam hire a digger,nobody gets any sleep.That machine works hard.
The yard has been influenced by so many different people and ideas,but mostly influenced by the weather.
We first started by digging huge draining pits and running soak away pipes all over the place.we then built the basic track and shaped it up to pretty much how we wanted it,we then spent two days driving up and down from the local quarry bringing stone and hardcore up to surface it.we then whacker platted it to the perfect shape we wanted.we then brought in limestone dust for the final track surface. Then we rode it,didnt like it,tore it down,and rebuilt it,still didnt like it,tore it down and rebuilt it till we got it right.
We then built two huge wooden ramps in the center of the track and built a load of wooden Quarter pipes in there as well,there was just so many ideas and not enough room,so we tryed to just build as much as possible into something that flows and is amazing to ride.
The pictures you see here are the best it has ever been and we will be shooting a section for our new web cast “The Atherton Project” on it soon. I will keep you updated on changes but everyone will have the chance to ride it at the Murrey jam we will be holding this year as a fund raiser for Bringing Steven back for the Jam at Jasons.